Serving Southern California — San Diego, Orange, Riverside & Los Angeles counties
New home under construction with electrical rough-in visible through open wall framing
  1. Home
  2. Services
  3. New Construction Electrical
New construction electrical

Electrical Systems Built Around the Project From the Start

New construction gives you the opportunity to plan electrical infrastructure before walls are closed and finishes are installed.

J.I.C. Electric provides electrical work for new homes, additions, ADUs and other construction projects, coordinating circuits, service capacity, lighting, devices and equipment requirements with the finished property.

Project stage

What Stage Is Your Project In?

The stage decides what is still cheap to change and what J.I.C. needs from you first. Your selection carries into the project inquiry below.

Planning

The most useful time to talk. Service size, panel location and the big load decisions are nearly free right now and expensive later.

  • ✓Expected loads listed before the plan is drawn
  • ✓Service size and meter location discussed early
  • ✓Lighting and device intent captured while it is only ink

Send the concept or the scope — no plan set required yet.

Plans complete

J.I.C. can review the electrical sheets against how the property will actually be used, and price the work from the drawings.

  • ✓Plan review and load calculation
  • ✓Scoped written estimate from the plan set
  • ✓Questions flagged before permit submittal

Attach the plan set with the inquiry.

In permitting

Good timing to lock the electrical scope and the schedule while the jurisdiction reviews.

  • ✓Scope and schedule confirmed
  • ✓Utility coordination requirements identified
  • ✓Rough-in window reserved

Tell us the jurisdiction and the expected issue date.

Foundation stage

Underground conduit, temporary power and service routing decisions happen here.

  • ✓Temporary power for the site
  • ✓Under-slab conduit and stub-ups
  • ✓Service and meter routing set

Confirm what is already in the ground.

Framing

The window before rough-in. Device, lighting and equipment locations get walked and marked.

  • ✓Walkthrough to mark boxes, cans and panel location
  • ✓Coordination with plumbing and HVAC routing
  • ✓Final appliance and equipment selections needed now

Send the framing schedule and the drywall date.

Ready for electrical rough-in

The work is scheduled against your drywall date. Availability is the real constraint at this point.

  • ✓Rough-in dates committed in writing
  • ✓Inspection coordination handled
  • ✓Trim-out scheduled with the finish trades

Lead with your target rough-in and drywall dates.

Services included

Rough-In Through Final Inspection

Complete electrical scope for residential construction — one contractor from plan review to the final walkthrough.

  • Ground-Up Residential Electrical

    Complete electrical installation for new residential construction, coordinated with the build schedule.

  • Custom Home Electrical

    Electrical systems planned around custom layouts, lighting, equipment and future electrical needs.

  • ADU Electrical

    Electrical systems for attached and detached accessory dwelling units.

    Explore ADU Electrical →
  • Additions & New Living Space

    Extend the existing electrical system to support additional rooms and new square footage.

  • Electrical Rough-In

    Wiring, boxes, circuits and required electrical infrastructure installed before the walls are closed.

  • Trim-Out & Finish Electrical

    Devices, switches, outlets, fixtures and the finished electrical components at the end of the build.

  • Lighting Planning & Installation

    Electrical infrastructure and fixture installation coordinated with the architectural layout.

    Explore Lighting Installation →
  • Service & Panel Planning

    Electrical capacity planned around the loads expected in the completed property.

    Panel & Service Upgrades →
  • Dedicated Circuits

    Power for appliances, HVAC, EV chargers and other equipment that should not share a circuit.

    Explore Dedicated Circuits →
  • EV-Ready Electrical

    Infrastructure for present or future EV charging, planned during construction rather than retrofitted.

    Explore EV Charger Installation →
  • Multifamily Construction

    Electrical work for apartment and multifamily projects where applicable.

    Explore Multifamily Electrical →
  • Subcontracting for Builders

    Project-based electrical support for general contractors and builders working from plans.

    Builder Electrical Services →
Planning considerations

Decisions That Are Cheap Now and Expensive Later

Almost everything expensive about construction electrical comes from a decision made after the walls closed.

  1. 1

    Service size

    The load calculation for the finished property — appliances, HVAC, EV, shop, outdoor — decides the service, not the square footage.

    Before permit
  2. 2

    Panel and meter location

    Where the equipment lands affects every home run in the house and the utility connection.

    Before framing
  3. 3

    Lighting layout

    Fixture locations laid out against the millwork and furniture plan rather than centered in the framing bay.

    Before rough-in
  4. 4

    Equipment selections

    Final appliance and HVAC selections drive dedicated circuit sizes. Substitutions after rough-in mean new home runs.

    Before rough-in
  5. 5

    Future capacity

    Spare conduit, panel spaces and an EV-ready circuit cost little during construction and a lot afterward.

    At rough-in
  6. 6

    Inspection sequencing

    Rough-in, service and final inspections planned into the schedule so electrical is not the trade holding up drywall.

    Throughout
FAQ

New Construction Questions

When should an electrician get involved in a construction project?+

At plans, or at the latest before framing is complete. Service size, panel location and load decisions are nearly free at that point and expensive afterward.

Can you work directly with my general contractor?+

Yes. J.I.C. regularly works as the electrical subcontractor on residential projects, from the plan set and the construction schedule.

Can you bid from a plan set?+

Yes. Send the electrical and architectural sheets plus your bid date and J.I.C. will confirm fit and availability before bidding.

Do you handle additions and ADUs as well as full houses?+

Yes. Added square footage and detached units are common work, including the feeder and subpanel back to the existing service.

Can capacity be planned for equipment I have not bought yet?+

Within reason. Circuits can be roughed for known equipment types and spare capacity left in the panel, but final circuit sizing follows the actual equipment requirements.

Do you carry a project through final inspection?+

Yes — rough-in, trim, testing, corrections and final inspection are part of the scope.

Construction project inquiry

Tell Us About Your Construction Project

Send the project type, the stage and the target dates. That is usually enough for a straight answer on fit, scope and availability.

  • ✓Plan-based written estimates
  • ✓Rough-in and trim dates committed in writing
  • ✓Works alongside your GC and the other trades