Serving Southern California — San Diego, Orange, Riverside & Los Angeles counties
  1. Home
  2. Services
  3. ADU Electrical
ADU electrical

Electrical for ADUs & New Living Space

An ADU creates an entirely new set of electrical loads within an existing property.

J.I.C. Electric can provide electrical work for ADUs while considering service capacity, panel configuration, lighting, receptacles, kitchen equipment, HVAC and the other electrical requirements of the finished space.

Project type

What Kind of ADU Are You Building?

The electrical approach changes with the structure and how it connects to the existing property.

Detached new ADU

A new structure needs a feeder from the existing service, its own subpanel and a full set of circuits.

  • ✓Existing service capacity assessed first
  • ✓Feeder sized for the distance to the structure
  • ✓Complete unit electrical from rough-in to trim

Distance from the main panel matters more than people expect.

Garage conversion

Existing garage circuits were built for a garage, not a dwelling — most of it gets reworked.

  • ✓Existing wiring evaluated and largely replaced
  • ✓Kitchen, HVAC and lighting circuits added
  • ✓Subpanel where the circuit count requires it

Tell us what already feeds the garage.

Attached ADU or addition

Attached units can sometimes extend the existing system — if the service can carry them.

  • ✓Load calculation on existing plus new
  • ✓Circuit extension or subpanel, whichever is right
  • ✓Tie-in planned so existing problems are not buried

Include the existing panel size if known.

Junior ADU or interior conversion

Converting interior space still adds kitchen and HVAC loads to a system sized without them.

  • ✓Kitchen and small-appliance circuits added
  • ✓Existing circuits separated where required
  • ✓Capacity confirmed before design is final

Plans or a sketch of the layout helps.

More than one unit

Two or more units raises metering, capacity and distribution questions early.

  • ✓Service and distribution strategy
  • ✓Metering requirements confirmed for the address
  • ✓Sequenced with the construction schedule

See Multifamily Electrical if this is a larger project.

Still in planning

The best time to involve an electrician. Capacity answers change ADU design decisions.

  • ✓Capacity answer before the plans are finished
  • ✓Panel and metering approach decided early
  • ✓Load-heavy selections flagged before they are bought

A capacity check now can save a design revision later.

What the service includes

Complete Electrical for the Unit

An ADU is a small house electrically — every system a dwelling needs, on a property already using its service.

  • Service Capacity Assessment

    Existing service, measured load and panel condition evaluated before the unit is designed around it.

    Panel & Service Upgrades →
  • Feeder & Subpanel

    Power to the unit with the feeder sized for the run and a subpanel located for the layout.

  • Rough-In & Trim

    Complete unit electrical: boxes, circuits, home runs, then devices, fixtures and controls.

  • Kitchen Circuits

    Small-appliance, range, refrigeration and other kitchen circuits sized to the equipment.

    Dedicated Circuits →
  • HVAC & Water Heating

    Circuits for mini-splits, heat pumps and electric water heating per the equipment nameplate.

  • Lighting & Devices

    Lighting layout, receptacles, switches and required protection throughout the unit.

    Lighting Installation →
  • Metering Coordination

    Separate, sub-metered or shared — requirements confirmed for your address rather than assumed.

  • EV-Ready Circuit

    Charging capacity planned during construction if it is wanted now or later.

    EV Charger Installation →
  • Permit & Inspection

    Permitted work carried through rough-in and final inspection with the build schedule.

Process

The Order These Decisions Have to Happen In

ADU electrical problems almost always trace back to a capacity question answered too late.

  1. 1

    Start with the existing service

    Panel size, actual conductors, available spaces and the real condition of the equipment — before design assumes anything.

    First
  2. 2

    Calculate the added load

    The unit’s lighting, receptacle, kitchen, water heating and HVAC load added to the existing house load.

    Decides capacity
  3. 3

    Decide feeder and subpanel

    How power gets to the unit, where the subpanel lands, and how the run is sized for distance.

    Design
  4. 4

    Plan kitchen and HVAC circuits

    These are the loads that usually force the capacity decision.

    Design
  5. 5

    Sort metering early

    Separately metered, sub-metered or shared changes the whole design — confirmed for your address.

    Before permit
  6. 6

    Get it on the plans

    Electrical decided at design costs a drawing revision. Decided at rough-in it costs a change order.

    Before construction
FAQ

ADU Electrical Questions

Can my existing service support an ADU?+

A load calculation on the existing service plus the new unit answers it. That check should happen before the design is finalized.

Does an ADU need its own panel?+

A subpanel at the unit is typical. Whether it is fed from the existing service or a new one depends on the capacity result.

Does it need a separate meter?+

That depends on the jurisdiction and utility requirements for your address, which get confirmed rather than assumed.

Can you wire a garage conversion?+

Yes. Existing garage circuits are evaluated and typically largely replaced, since a dwelling needs far more than a garage.

How far can the ADU be from the main panel?+

Distance is a design input, not a blocker. Longer runs mean larger conductors to manage voltage drop.

When should I contact an electrician about an ADU?+

During planning. The capacity answer frequently changes design decisions that are expensive to revisit later.

ADU project inquiry

Planning an ADU?

The most useful things to send are the existing panel size, the ADU type and roughly how far it sits from the main panel.

  • ✓Capacity assessed before design is final
  • ✓Feeder and subpanel sized for the distance
  • ✓Coordinated with your builder and the schedule